Fortra

How is the Average Risk Level on a host calculated?

Answered

Comments

1 comment

  • Official comment
    Avatar
    Jesper Jurcenoks

    The average risk level is calculated mathematically.

    For all the vulnerabilities of a Host, a host group, or a vzone, the risk score of the vulnerabilities are added together and the sum is divided by the number of vulnerabilities. This average numerical value is then translated into an average risk level: High, medium etc.

Please sign in to leave a comment.